DM.58/19
The Committee considered the details
of the planning applications prepared by the Planning Case Officers
as presented in the agenda papers, and considered also the comments
of Town and Parish Councils, together with other representations
received, which were listed within the presented agenda reports,
and RESOLVED that:
a)
3964/18/HHO “The
Boathouse”, South Town, Dartmouth
Town:
Dartmouth
Householder application for construction of external access lift,
associated bridge link and other external works
Case Officer Update:
Two more objections received but no new, unconsidered
reasons. Further to site visit, officer
confirmed that the retaining wall does belong to South Hams
District Council.
Speakers included:
Objector – Mr John Langridge:
Supporter – Mr Alex Bateman: Town
Council representative – Cllr Dawn Shepherd: Ward Member – Cllr Hilary Bastone
Recommendation:
Conditional approval
Committee Decision: Conditional approval
Conditions: 1. Standard time limit
2.
Accord with plans
3.
Construction Management Plan – prior to commencement
4.
Details of lighting – prior to installation of lift car
5.
Lift car to return to lower level after use
6.
Details of gate/access – prior to installation
7.
Details of materials/finishes – prior to installation
8.
Any works to boundary wall to match existing wall
b)
3703/18/OPA Land at SX 651560
– Filham, Ivybridge
Town: Ivybridge East
& Ermington and Ugborough
Development: READVERTISEMENT (Revised Plans Received) Hybrid
application for the erection of up to 200 dwellings, comprising the
following: Phase 1 – detailed application for the erection of
94 dwellings (C3), formation of access with Exeter Road (B2131),
new spine road, internal roads and footpaths, surface water
infiltration ponds, landscaping, ground and utilities works and
associated infrastructure; and Phase 2 - outline application for up
to 106 dwellings (C3) with all matters
reserved except for access; strategic landscaping, surface water
drainage works, highway works and diversions and associated
infrastructure.
Case Officer Update: Nothing found during the
phase one archaeological site investigation. Application was withdrawn from the last
Development Management Committee meeting to allow clarification of
the David’s Lane crossing point from phase one to phase two,
which has now been done. The CCG
(Clinical Commissioning Group) has requested £80,925 for a
health contribution to meet increased demand following site
occupation which has resulted in the addition of another
condition. Two more LORs (letters of
representation) have been received including one from Ivybridge
Health Centre. There were several
corrections to the report: Condition 31
listed on page 27 at the start of the report refers to reserved
matters in error and should instead be “Development in
accordance with the submitted Energy Strategy Statement”.
Where written in full on page 61 at the end of the report, this
condition should also be numbered 31.
In the proposal description on page 31 the numbers of dwellings
referred to for each phase should be updated to read that Phase 1
is for 94 dwellings and Phase 2 for the remaining 106 dwellings
which totals the 200 across the whole site which the application
seeks. Condition 9 of full consent
shall be amended ...
view the full minutes text for item DM.59/19